Niobrara-Crude Transloading Terminal. Kinley built a new 26 railcar loading facility and eight spot truck offloading area. The project included building a 60 foot by 800 foot canopy over the loading platform with a foam fire protection system. The mechanical work included running approximately 12,000 linear feet of transfer piping. The project also included four 300 HP centrifugal pumps and 20 motor-operated valves.