This crude oil terminal project consisted of two (2) 250,000 BBL tanks, six (6) LACT units, above and belowground piping, 150 tons of steel pipe supports, two (2) meter skids and six (6) truck unloading positions. Subcontracted scope included all electrical and integration work.