Installation of seventy (70) loading and unloading spots for hot wax crude oil transported by rail. Other work included a new fire water system, eight (8) centrifugal pumps, new tank farm pumps and all piping 1″ thru 36″, two (2) meter skids, prover skid and five (5) vertical can pumps.