Kinley served as general contractor, working with Southwest Airlines on relocating the BWI Hydrant Fueling System. The project was a Bi-product of SWA’s A-B connector terminal expansion project. Our scope of work included relocating the existing jet fuel hydrant system and adding additional isolation vaults for future fueling. Kinley performed the demolition of the existing system, installed 1,100 linear feet of 20” (200 linear feet was doublewall) jet fuel pipeline, and constructed a cast-in-place concrete isolation vault.