Kinley installed a new fueling system for Terminal D and increased the overall fuel capacity with two new (2 million gallons each storage tanks). The scope included the install of 67 hydrant fueling pits, 3200 linear feet of 14” loop piping and hot-tapping into existing system. Kinley also made Hydrant System Modifications at Terminals A, C and E, built a wastewater system for collection, storage treatment and disposal of wastewater generated by the airport’s hydrant system, and is making fire protection system upgrades for DFW’s tank farm.